Access the Full Project by Clicking here!
Bidjugde
JOB
Potter Bay Bolivar Paving
BID DATE
03/17/15 - 2:00
AGENCY
Berkeley
ESTIMATE
$950,000
SCOPE
The work to be done consists, in general, of traffic control, relocation of wood fence, removal of existing asphalt, base rock and sand subgrade, placing geotextile fabric, Class 2 aggregate base, and Hot Mix Asphalt (Type A), conforming to City manholes, other drainage structures and other utility boxes, installation of AC dikes, traffic striping, pavement marking and traffic signs, as specified. All work shall be performed in accordance with these plans and specifications.. A California A contractors license is required to bid this contract. Wendy Wong, Assistant Public Works Engineer via email at wwong@cityofberkeley.info

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT