Access the Full Project by Clicking here!
Bidjugde
JOB
Nhcrwa 31a 36 Inches 30 Inches 24 Inches 16 Inches 12 Inches Water Line From Gessner Rd Bending Br
BID DATE
05/9/24 - 2:00
AGENCY
North Harris County Regional Water Authority
ESTIMATE
$31,000,000
SCOPE
Scope of Work is for the construction of North Harris County Regional Water Authority (NHCRWA) Project 31A, proposed 36", 30", 24", 16", and 12" water line from Gessner Rd to Bending Brook Ln, connection and conversion to chloramines at three municipal utility districts (MUD). The project consists of 36-inch, 30-inch, and 24-inch transmission lines along public rights-of-way and the Authority's easements by a combination of open cut and tunneling construction methods, including valves, connections, and appurtenances from the Authority's Project 24C west of North Gessner Road to White Oak Bend water plant north of Fallbrook. The project is to be constructed within the Harris County's right-of-way, inside the Authority's water line easements and inside the existing water receiving facilities (WRF). The project also includes proposed 16-inch and 12-inch water lines connection to existing Aqua Texas Heron Lakes Water Plant No. 1 and No. 2, White Oak Bend MUD Water Plant, Reid Road MUD #1 Water Plant No. 1 and No. 2. The connection of the WRFs include the construction of the flow meter and flow control stations, connections to the ground storage tanks, chloramination modifications, and miscellaneous modifications, as shown on the plans at three municipal utility districts (MUD). https://www.civcastusa.com/project/66170c47b6780130dbe033ce/summary melissa.ramos@aecom.com
UPDATES