Access the Full Project by Clicking here!
Bidjugde
JOB
Cross Street Bridge Replacement
BID DATE
05/14/24 - 3:00
AGENCY
San Bernardino
ESTIMATE
n/a
SCOPE
The work to be done consists in general, of fabricate and place construction information signs, clearing and grubbing; Cross street bridge construction and Fairfax playground restoration removal and construction of various concrete improvements, including curb ramps, roadway mill; remove and optional work to replace deteriorated asphalt concrete pavement, asphalt concrete overlay; application of traffic striping and pavement markings; adjustment of existing utility frames and covers and City water valves; NPDES; traffic control; survey marking and such other items or details, not mentioned above, that are required by the Plans, Standard Specifications, or these Special Provisions. Michelle Parra 909-384-5083 parra_mi@sbcity.org https://vendors.planetbids.com/portal/39495/bo/bo-detail/116968
PREBID
4/25/2024 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT