Riverdale Storm Water Improvement
BID DATE
04/30/24 - 2:00
AGENCY
Riverdale
ESTIMATE
$237,500
SCOPE
he work includes furnishing all labor, tools, materials, equipment, transportation, and services required for construction of the above projects; consisting of the following items of work: mobilization; obtaining all bonds and insurance; for Schedule A: furnishing and installing approximately 225 feet of pvc storm water pipe, removing storm water manholes and catch basins, removing and replacing curb and gutter, asphalt patching, miscellaneous landscaping; Schedule B: removal of inlet dip-stones, curb & gutter, removal of sidewalk; asphalt, and roadbase; removal of concrete flat work and driveway approaches, installation of double hooded catch basins, curb and gutter, possible handicap ramps, and miscellaneous landscaping; installation of roadbase and asphalt surfacing