Access the Full Project by Clicking here!
Bidjugde
JOB
Alves Street Leighton Street Drainage Improvements
BID DATE
04/23/24 - 5:00
AGENCY
Hayward
ESTIMATE
$165,000
SCOPE
The work consists, in general, of drainage improvements in the form of creating a valley gutter at the intersection of Alves Street and Leighton Street to alleviate drainage issues during heavy storms. There will also be street pavement grading at the intersection including full width grinding, placing HMA overlay, adjusting utility frames and covers to grade, protecting existing curbs, and performing other items or details, not mentioned above, that are required by the plans, and as specified in the Standard Specifications or these Special Provisions. kevin.yoshiki@hayward-ca.gov https://www.bidnetdirect.com/california/solicitations/open-bids/Alves-Street-and-Leighton-Street-Drainage-Improvements-Project/0000347468?purchasingGroupId=88020151&origin=2
PREBID
4/9/2024 1:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT