projects bidding

Access the Full Project by Clicking here!
Bidjugde
JOB
Alvernon Way and Valencia Road Intersection Improvements
BID DATE
05/17/11 - 2:00
AGENCY
Pima County
ESTIMATE
$2,500,000
SCOPE
The project consists of furnishing all labor, materials, equipment and supervision necessary for roadway and drainage improvements described in the project plans. The work consists of reconstructing the existing Alvernon Way and Valencia Road to provide dual left turn lanes at all approaches at the intersection. The length of project is 2,580 feet on Valencia Road and 1300 feet on Alvernon Way. The work also includes, but is not limited to the following; paving, re-construction of curb and gutter and concrete sidewalk, re-construction of a storm drain system, cross drainage structures, traffic signal, furnishing and installing pavement markings and signing, landscaping, and other related incidental work. The project is located within Sections 9, 10, 15, and 16 of Township 15 South, Range 14 East, Gila and Salt River Meridian, Pima County, Arizona

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT