Forest Creek Lift Station Force Main
BID DATE
04/25/24 - 2:00
AGENCY
Conroe
ESTIMATE
$2,419,000
SCOPE
This project is for the removal of two existing sanitary lift stations and construction of a new lift station and force main. The existing lift station which serves the Forest Creek Subdivision will be replaced with a 0.893 MGD duplex lift station with approximately 5,000 LF of new 8-inch force main by open-cut and trenchless methods. The other lift station which serves Willis Independent School District will be converted into approximately 1,030 LF of 12-inch gravity sewer. Both existing lift stations currently share an approximately 11,500 LF 4-inch force main which will be abandoned and filled with grout as part of the project. The project scope also includes but is not limited to installing a natural gas generator with automatic transfer switch,electrical controls, SCADA system, and all other appurtenances https://www.civcastusa.com/project/6614055b427ef2b0dfeb12b0/summary
PREBID
4/16/2024 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT