Access the Full Project by Clicking here!
Bidjugde
JOB
McBean Park Drive Phases 2A 2B 2C
BID DATE
05/9/24 - 3:00
AGENCY
Lincoln
ESTIMATE
n/a
SCOPE
Earthwork/ cut to fill, sub-grade preparation, dewatering (if needed), import or export as necessary to balance Oak Tree Lane and McBean Park Drive right of way (excess material may be placed within the School/ MDR site at the NE corner of Oak Tree Lane and McBean Park Drive or as directed by the developer), demolition and reconstruction of roadway and curb and gutter, provide all labor, equipment, materials & testing necessary to construct curbs, gutters, sidewalks, median curbs, storm drain pipes, manholes, culverts, D.I’s, headwalls, sewer manholes, pipes, water main pipes, valves, fire hydrants, signal and conduit, service pedestal, irrigation sleeve, roadside ditches, asphalt pavement, striping, streetlights, site erosion control, and per the SWPPP plans prepared by Holly McClure. https://vendors.planetbids.com/portal/48920/bo/bo-detail/116656 bids@frayjidg.com
UPDATES