State Route 90 Sewer Reroute
BID DATE
04/26/24 - 10:00
AGENCY
Sierra Vista
ESTIMATE
n/a
SCOPE
This project involves the installation of constructing a new sewer line parallel to an existing sewer line and tying the new sewer line into the existing system. It will require constructing approximately 1,228 linear feet of 10-inch gravity sewer pipe and the construction of 5 precast polymer concrete manholes. Rehabilitation of two existing manholes will also be required. One of the new manholes will be installed on an existing line. The new sewer line is being constructed in order to divert flow from a problematic portion of the system. The problem area is approximately 800 feet long and will be abandoned. The new sewer will connect to existing stub-out pipes at both ends of the project. kennie.downing@sierravistaaz.gov https://procurement.opengov.com/portal/sierravistaaz/projects/85190