Access the Full Project by Clicking here!
Bidjugde
JOB
7th 10th 14th Streets Rehabilitation Project
BID DATE
04/18/24 - 1:00
AGENCY
Imperial
ESTIMATE
n/a
SCOPE
The work to be done consists of furnishing all materials, equipment, tools, labor and incidentals as required by the contract documents. The work to be performed includes the following activities for this contract: Removal of existing asphalt in poor conditions, grind and overlay in parts of streets as needed, installation of ¾” asphalt leveling course, installation of asphalt-rubber aggregate membrane (ARAM), installation of gap-graded asphalt rubber hot mix (ARHM), slurry seal, utility adjustments, removal and replacement of concrete curb & gutter, sidewalks and ADA ramps, installation of thermoplastic striping. Includes road traffic control around the construction zones. All work to be completed within existing City of Imperial public right of way. The scope of work includes, prior to the start of construction, the coordination between the City of Imperial and the Contractor. https://www.cityofimperial.org/bid-no-2024-01-7th-10th-14th-streets-rehabilitation-project jvillegas@cityofimperial.org "
UPDATES