Access the Full Project by Clicking here!
Bidjugde
JOB
Structural Reach Replacement WW01002
BID DATE
04/30/24 - 2:00
AGENCY
Los Altos
ESTIMATE
$850,000
SCOPE
The project includes, but is not limited to, the removal and replacement of existing 6-inch and 8-inch VCP with 8-inch HDPE sewer mains using pipe reaming/ horizontal directional drilling (HDD) pipe replacement construction methods, sewer lateral reconnections, sewer manhole reconnections, surface restoration, traffic control, mobilization, stormwater control, utility coordination, sewage bypassing, video inspection of the segments, removal of outside drop pipe system, existing sewer main abandonment in place, survey referencing of existing survey monuments, reinstallation of existing survey monuments if disturbed during construction, and all other work as shown on the Plans and as called for in the Project Specifications and as directed by the Engineer. https://bids.losaltosca.gov/rfp/bid-structural-reach-replacement-0"

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT