Access the Full Project by Clicking here!
Bidjugde
JOB
Agua Hedionda Sewer Lift Station Vista Carlsbad Interceptor
BID DATE
04/8/15 - 2:00
AGENCY
Carlsbad
ESTIMATE
$43,500,000
SCOPE
onstruction of a prefabricated steel truss bridge, construction of a 33 million gallon a day capacity wastewater lift station; construction of approximately 4,000 lineal feet of 36-inch diameter HDPE sewer force main pipeline by open cut and trenchless methods of installation; construction of approximately 6,900 lineal feet of 54-inch diameter gravity flow sewer pipeline by a combination of open cut and trenchless construction methods; construction of approximately 290 lineal feet of 42-inch diameter gravity flow pipeline and construction of approximately 11,000 lineal feet of 18-inch and 12-inch diameter PVC recycled water pipeline and appurtenances. The project includes demolition of the existing sewer lift station, removal of a wooden truss bridge and removal of approximately 1,200 lineal feet of 42-inch diameter reinforced concrete sewer pipe and the miscellaneous components of the existing sewer. The project also includes approximately 290,000 square feet of Asphalt Concrete overlay work. Terry Smith City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008 Tel:(760) 434-2765 Fax:(760) 602-8562 terry.smith@carlsbadca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT