Access the Full Project by Clicking here!
Bidjugde
JOB
Coronel Path Repair Project
BID DATE
04/29/24 - 3:00
AGENCY
Santa Barbara
ESTIMATE
n/a
SCOPE
The Project is located along Coronel Path between Loma Alta Drive and Coronel Street, and behind McKinley Elementary School and is described as follows: the Project is aimed at addressing the hillside sloughing and preventing future erosion. The Coronel Path Project will address the erosion of the hillside at the bottom of Coronel Path by proposing to fill and grade the eroded areas, add designated plantings at the top and bottom sections of the eroded areas; install erosion control netting with a combination of hydroseeding, straw wattles, and topsoil near the center of the eroded areas; install k-rails at the base of the project limits, provide plant establishment, perform tree trimmings, and tree and stump removals. https://pbsystem.planetbids.com/portal/29959/bo/bo-detail/116095 abounchaleun@santabarbaraca.gov
UPDATES