Access the Full Project by Clicking here!
Bidjugde
JOB
Lost Hills Road Interchange
BID DATE
02/27/15 - 2:00
AGENCY
Calabasas
ESTIMATE
n/a
SCOPE
The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents. The general items of work include removal of an existing bridge and construction of a new bridge; roadway construction; staged construction; construction of storm drain mainline, laterals and appurtenances; installation of traffic signals and ramp meter system; installation of signing and striping; water main construction; installation of irrigation and landscaping; preparation of Stormwater Pollution Prevention Plan and compliance thereof; compliance with environmental permits; and other items not mentioned that are required by the Plans and Specifications. Pauline RubioBrownell at (818) 224-1678, or by email at pbrownell@cityofcalabasas.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT