Access the Full Project by Clicking here!
Bidjugde
JOB
2015 Sewer Storm Drain Improvement
BID DATE
03/6/15 - 2:00
AGENCY
Belmont
ESTIMATE
$676,800
SCOPE
Removing and replacing VCP sewer (open trench), pipe bursting, sewer lateral reconnection and relocation; removing, replacing and installing storm drain components such as, but not limited to, drain inlets, manholes, cleanouts, HDPE pipe; providing traffic control, providing construction area signs, providing water pollution control, cleaning of the site at the end of the job, and the furnishing of all labor, materials, tools, equipment, mechanical workmanship, transportation, and services necessary to be done in order to perform a complete job in all respects as indicated on the plans, and by reference made a part hereof, as specified herein, and as directed by the Engineer at various locations John Tallitsch City of Belmont One Twin Pines Lane Belmont, CA 94002 Tel:(650) 637-4701 Fax:(650) 593-8394 jtallitsch@belmont.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT