Access the Full Project by Clicking here!
Bidjugde
JOB
Scott Road Gap Transmission Pipeline Project
BID DATE
04/17/24 - 10:00
AGENCY
Eastern Municipal WD
ESTIMATE
$2,000,000
SCOPE
Under these Specifications the Contractor shall perform all work for the installation of approximately 800 linear feet of 30-inch CML&C steel transmission pipeline, 20 feet of 12-inch PVC C-900 pipeline, 1 foot of 24-inch PVC C-900 pipe, including all appurtenances and restraining of and connections to existing lines. Work shall include manway structure, thrust collars, valves, blow-offs, air valves, shoring and bracing per California Labor Codes, backfill, pavement removal, replacement and restoration per encroachment permits, trench and pipeline dewatering, disinfection, traffic control, and other related work. All work shall be in accordance with these specifications and the contract drawings. Quantities are approximate. Bidders are responsible to verify actual quantities from the detailed design drawings to accurately calculate quantity take-offs. https://pbsystem.planetbids.com/portal/25577/bo/bo-detail/107191 morgensj@emwd.org
PREBID
3/27/2024 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT