2025 Smp Package Iv Bell Drive
BID DATE
04/9/24 - 11:00
AGENCY
San Antonio Water System
ESTIMATE
$2,550,000
SCOPE
The base bid is for the construction of approximately 6,430 LF of 6 to 12-inch PVC C-900, 432 LF of 2-inch HDPE DR 9 water mains, and 599 LF of 8-inch sanitary sewer mains via open-cut construction with a construction duration of 240 calendar days. Bid Alternative 1 is generally described as executing the identical scope of construction, while completing the project with an accelerated schedule of 200 calendar days. Bid Alternative 1 also includes the installation of approximately 2,747.70 CY of flowable fill (Sewer 402.7 CY, Water 2,345 CY) as secondary backfill. https://apps.saws.org/business_center/contractsol/Drill.cfm?id=4332&View=Yes