Access the Full Project by Clicking here!
Bidjugde
JOB
Transmission Main Partial Replacement
BID DATE
04/10/24 - 2:30
AGENCY
Bell County Water Control & Improvement District
ESTIMATE
$8,500,000
SCOPE
The Work consists of furnishing and installing approximately 5,200 linear feet of new 48-in water transmission main; restrained joints; air valve assemblies and blow-off valves; pipe, fittings, valves, and appurtenances for connection to the existing piping; air valve and surge relief assembly replacements; and all other work as specified and shown on the Drawings. https://www.civcastusa.com/project/65f1feb365861e620c477683/summary Furrierg@cdmsmith.com
PREBID
3/27/2024 1:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT