Access the Full Project by Clicking here!
Bidjugde
JOB
Quiet Zone Railroad Crossing Improvements Package 1 Construction
BID DATE
12/19/24 - 4:00
AGENCY
Longmont
ESTIMATE
n/a
SCOPE
The work to be performed under this contract generally includes railroad crossing improvements at four public roadway crossings of the Railroad tracks at the locations specified below. Major construction items vary at each crossing and may include raised medians, channelizing devices removals, asphalt pavement construction, concrete curb/ gutter and sidewalk, pavement markings and traffic control. BNSF Railway Co. (Railroad) will be performing the installation of railroad gates/ flashers, bungalow and surface crossing material. Work may be within the right-of-way of the BNSF Railway (Railroad) and/or the City of Longmont. The Contractor will be responsible for coordinating the work activities with Railroad. All safety requirements, including safety orientation and agreements to work within the Railroad property shall be completed by the contractor prior to initiating any work in the adjacency of the Railroad tracks, as required by the Railroad in the respective Grade Construction and Maintenance Agreements for each crossing (Appendix B). The Contractor shall be responsible for supplying all labor, materials, surveying, and equipment necessary to complete the work in accordance with the project plans and specifications. The total quantities and type of work estimated in the Bid Schedule is representative of the estimated quantities; however, these quantities may be revised by the City to represent actual field conditions at the time of construction. All work shall be performed in accordance with City of Longmont Public Improvements Design Standards and Construction Specifications Manual – most current update, and Colorado Department of Transportation (CDOT) Standard Specifications for Road and Bridge Construction. The Longmont manual is available online at www.ci.longmont.co.us or in hard copy at Public Works and the CDOT manual is available online at https://www.codot.gov/business/designsupport/cdot-construction-specifications/2023-construction-specifications This is a local agency project that is funded with Federal Contributions by the U.S. Department of Transportation Federal Railroad Administration (FRA). Contractor must be in compliance with the applicable requirements from the FRA Agreement included as Appendix A and the Contract Addendum – Federal Grant Requirements for Procurement Contracts included as part of the Sample Contract. Note: The City is still working on establishing an easement agreement for Bid Schedule C. The City reserves the right to remove Bid Schedule C from the Project in the case an easement agreement cannot be established. https://www.bidnetdirect.com/colorado/solicitations/open-bids/Quiet-Zone-Railroad-Crossing-Improvements-Package-1-Construction/0000345794?purchasingGroupId=8409951&origin=2 michelle.davis@longmontcolorado.gov "
UPDATES