Access the Full Project by Clicking here!
Bidjugde
JOB
1700 East Improvements Fort Union Bike Path
BID DATE
04/4/24 - 2:00
AGENCY
Cottonwood Heights
ESTIMATE
n/a
SCOPE
Schedule A: 1700 East Improvements Work for roadway improvement project consists of the following items of work: mobilization, traffic control, and maintenance of traffic; reconstruction of miscellaneous structures to grade; relocation of water services, mailboxes, gates, signs, walls and any such miscellaneous structures conflicting with the improvements; all required earthwork; construction/reconstruction of curb and gutter, sidewalks, driveway approaches, ADA access ramps; rotomilling and/or asphalt removal of existing pavement; placing and compacting new asphalt surface course; placing of tack coat and pavement reinforcement fabric; traffic paint striping, messages; and all appurtenant work; all in accordance with Drawings and Specifications prepared by the Engineer. Schedule B and Schedule C: Fort Union Bike Path Work for bike path improvement project consists of the following items of work: mobilization, traffic control, and maintenance of traffic; reconstruction of miscellaneous structures to grade; removal of storm drain structures, and any such miscellaneous structures conflicting with the improvements; all required earthwork; construction/reconstruction of curb and gutter, sidewalks, driveway approaches, driveways, ADA access ramps; storm drain structures and piping, utility coordination/relocation, asphalt removal of existing pavement; placing and compacting new asphalt surface course; placing of tack coat and; replacing traffic paint striping, messages; and all appurtenant work; all in accordance with Drawings and Specifications prepared by the Engineer. BNelsen@ch.utah.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT