Access the Full Project by Clicking here!
Bidjugde
JOB
American Fork River Diversion Reconstruction
BID DATE
04/17/24 - 2:00
AGENCY
Pleasant Grove
ESTIMATE
n/a
SCOPE
This project will remove the old concrete structures that exist on the river where the river exists the canyon. The project will then install the new concrete diversion structure that will divert river flows into 10 separate pipes that will convey metered water to the three irrigation districts. Extra water will be sent over Coanda screens that will then make its way down the existing American Fork River. The project has an optional alignment that American Fork River flows may be dammed and piped around the project for the duration of the project. Potential staging areas are also shown on the plans. Britton Tveten +1 801-785-2941 btveten@pgcity.org
PREBID
3/28/2024 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT