Access the Full Project by Clicking here!
Bidjugde
JOB
CIP ST016 Richland Road Storm Drain Replacement
BID DATE
04/16/24 - 2:00
AGENCY
San Marcos - CA
ESTIMATE
$171,500
SCOPE
The work will consist of the replacement of an existing corrugated metal pipe storm drain with a reinforced concrete pipe. The replacement of existing sidewalk, curb ramps, landscaping and irrigation is also included. A detailed Scope of Work can be found in the IFB Documents. s='bg_grey' href='mailto:acuffari-pagan@san-marcos.net' target='_blank'>acuffari-pagan@san-marcos.net https://pbsystem.planetbids.com/portal/39481/bo/bo-detail/114439

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT