Access the Full Project by Clicking here!
Bidjugde
JOB
(CMAR) Storm Drain Improvements Roosevelt Street
BID DATE
05/9/24 - 12:00
AGENCY
Tempe
ESTIMATE
$7,000,000
SCOPE
The project will include: • Extension of the existing 78-inch Roosevelt Street storm drain and outlets to Indian Bend Wash at Roosevelt Street. • New storm drains to capture the flows in the east-west streets north of Roosevelt Street/Continental Drive (in Scottsdale) • Installation of three new laterals lines in 74th Street., 70th Street, and 68th Street. • Installation of a fourth lateral line at the west end of Continental Drive, through Supai Middle School, to intercept the 100-year, 6-hour peak discharge that is released through the 42-inch culvert underneath the Crosscut Canal. • Inlets along Roosevelt Street/Continental Drive at the upstream side of intersecting streets to collect runoff before it can leave the roadway gutter and flow to the south, improving drainage conditions for the neighborhood areas south of Roosevelt Street /Continental Drive. • Also included are sidewalks, curbs, gutters, pavement preservation/replacement, and other appurtenances as needed. contractor_support@tempe.gov
UPDATES