2021 22 Street Reconstruction
BID DATE
04/9/24 - 10:00
AGENCY
San Bruno
ESTIMATE
n/a
SCOPE
The work includes but is not limited to: Hot mix asphalt base repair and full depth reclamation, removing and replacing concrete sidewalk, curb and gutter, installing ADA compliant curb ramps, and replacing striping. All work items shall be constructed in accordance with the contract plans and specifications. Bidding Documents contain the full description of the Work. https://www.sanbruno.ca.gov/bids.aspx?bidID=50 or https://www.barkerblueplanroom.com/jobs/275/details/2021-22-street-reconstruction-project