Trophy Club Municipal Utilility District No 1 Fy 2024 Water Line Replacement
BID DATE
04/1/24 - 10:00
AGENCY
Trophy Club Municipal Utility District
ESTIMATE
$2,160,000
SCOPE
This project includes construction of approximately: • 6,130 LF – 8” C900 PVC Water Line (Open Cut) • 70 LF – 8” C900 PVC Water Line (By Other Than Open Cut) • 50 LF – 6” C900 PVC Water Line (Open Cut) • 1,060 LF – 2” Polyethylene SDR-9 Water Line (By Other Than Open Cut) • 5 – 12” Gate Valve • 22 – 8” Gate Valves • 8 6” Gate Valves • 3 – 2” Gate Valves • 8 – Fire Hydrants • 126 - Services https://www.civcastusa.com/project/65cfc19c6dad2efbaf2c036a/summary lhodge@halff.com
PREBID
3/7/2024 10:00