Access the Full Project by Clicking here!
Bidjugde
JOB
Mosley Rd Street Rehabilitation Tirz 8 From Ih 45 Scranton St
BID DATE
04/2/24 - 10:00
AGENCY
Gulfgate Redevelopment Authority
ESTIMATE
$8,000,000
SCOPE
The Mosley Rd Street Rehabilitation project generally involves a base bid and 3 Alternate bid improvements as follows: Base Bid The Base Bid improvements limits are from Scranton St to Airport Blvd (STA 32+88.74) including the southern portion of Airport Blvd and includes the following improvements: Preparatory work for sampling and analysis on Potentially Petroleum Contaminated Areas (PPCA). Construction of high early strength 11-inch reinforced concrete pavement with lime stabilized subgrade and doweled concrete curbs. Construction of high early strength 7-inch and 9-inch reinforced concrete driveways. Limited construction of reinforced concrete sidewalks, and wheelchair ramps. Remove and replace storm sewer pipes with reinforced concrete storm pipes ranging in diameters from 12-in to 30-in, 18” x 29” arch pipes, 23” x 37” arch pipes, and 27” x 44” arch pipes. Removal and replacement of storm sewer manholes and inlets. Limited installation of 10-inch sanitary sewer, manholes and appurtenances. Installation of 8-inch water line, fire hydrants, and related appurtenances. Installation of proposed thermoplastics pavement markings and signage. Alternate 1 The alternate 1 improvements limits are from Airport Blvd (STA 32+88.74) to IH-45 southbound Feeder road, and includes the following improvements: Asphaltic concrete full depth reconstruction which includes asphaltic concrete, base and subgrade. Installation of monolithic curb and gutter, flush curb/gutter and doweled curbs. Construction of high early strength 7-inch reinforced concrete driveways. Limited construction of reinforced concrete sidewalks, and wheelchair ramps. Installation of proposed thermoplastic pavement markings and signage. Alternate 2 The alternate 2 improvements limits are from Airport Blvd (STA 32+88.74) to IH-45 southbound feeder road, and includes the following improvements: Preparatory work for sampling and analysis on Potentially Petroleum Contaminated Areas (PPCA). Installation of 8-inch water line, fire hydrants, and related appurtenances. Alternate 3 The alternate 3 improvements limits are from STA 1+00 to STA 17+05.92, and includes the following improvements: Preparatory work for sampling and analysis on Potentially Petroleum Contaminated Areas (PPCA). Cleaning/de-silting of existing reinforced concrete box (RCB) storm sewers. RCB storm sewer inside joint repairs. https://www.civcastusa.com/project/65e0fc5763e50e657edb92ba/summary mhwoodward@lan-inc.com
UPDATES