JOB
(CMAR) Water Supply Inter Connect
BID DATE
05/13/24 - 2:00
AGENCY
Glendale - AZ
ESTIMATE
$2,400,000
SCOPE
28101 N. 63rd Drive, Phoenix, AZ within the City of Phoenix municipal city limits. This project includes the installation of approximately 160-ft. of new 12-inch waterline which will connect to an existing City of Phoenix transmission line in Pyramid Peak Parkway (within Phoenix right-of-way). The new 12-inch waterline will be routed below grade to connect to the Pyramid Peak WTP 36-inch distribution line located on the WTP property. At the point of connection, the new waterline will connect above grade to a new piping assembly consisting of a backflow preventer, flow meter, flow control valve, and a City of Phoenix isolation valve. degree rotation of an existing above grade 12-inch backflow preventer, to allow flow in the oppsite direction, as well as an additional City of Phoenix isolation valve upstream of the backflow preventer. The existing subsurface concrete vault will be reused and the piping within modified. The area between the backflow preventer and the vault will be excavated and the existing 12-inch piping removed and replaced with 8-inch piping. EngineeringDept@glendaleaz.com
UPDATES