Access the Full Project by Clicking here!
Bidjugde
JOB
3100 E Storm Drain Improvements Phase 1 2
BID DATE
04/2/24 - 4:00
AGENCY
Millcreek
ESTIMATE
n/a
SCOPE
Project entails new reinforced concrete storm drain pipe, new storm drain single and double curb inlet catch basins, new storm drain manholes, new culinary water line loops of the existing water infrastructure, trenching, hot mix asphalt, as shown on the plans and as described herein. Work located at approximately 3100 East between Upland Dr and 3900 South, Millcreek, Utah. Frederick Lutze +801 (214) 2720 flutze@millcreek.us
UPDATES