Access the Full Project by Clicking here!
Bidjugde
JOB
Manhattan Beach Boulevard Eastbound Left Turn Improvement Aviation Boulevard
BID DATE
03/21/24 - 11:00
AGENCY
Manhattan Beach
ESTIMATE
$400,000
SCOPE
The purpose of the improvement is to increase eastbound left-turn capacity by elongating the existing eastbound left-turn pocket, modifying the median island, installing state-of-the-art infrastructure, and optimizing signal operations. Specifically, the proposed improvements include: • Elongate the existing eastbound left-turn lane pocket; • Upgrade intersection signal system, including traffic controller, signal poles signal heads and push button, etc.; • Reconstruct the median island located on MBB west of Aviation Boulevard to accommodate the elongated left-turn pocket; • Adjust the existing detection camera, or install a new camera if necessary, to cover the elongated eastbound left-turn pocket; and • Optimize the intersection signal operation by adjusting the signal timing assignment. Helen Shi/310-802-5354 hshi@manhattanbeach.gov https://pbsystem.planetbids.com/portal/48136/bo/bo-detail/113873#

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT