JOB
R1 Sewer
BID DATE
03/21/24 - 2:00
AGENCY
St George
ESTIMATE
n/a
SCOPE
All labor, equipment, and materials needed to construct the R1 Sewer Project which generally includes: construction of approximately 1,536 linear feet of 18-inch sewer pipeline; and sewer service pipeline reconnections within the project boundaries shown on the drawings in St. George, Utah. The work also includes traffic control, bypass pumping and dewatering, manhole installation, asphalt surface restoration, landscape restoration, and appurtenances associated with a sewer pipeline job. tolsen@bowencollins.com mary.wahl@sgcity.org