Access the Full Project by Clicking here!
Bidjugde
JOB
Walnut Creek Desilt
BID DATE
03/12/24 - 2:00
AGENCY
Contra Costa County
ESTIMATE
$5,160,000
SCOPE
The work to be done generally consists of removing approximately 115,000 cubic yards of channel sediment material from designated areas of Walnut Creek channel from approximately 2000' north of Concord Ave to the 3000' south of Concord Avenue. Work also includes placing a stake and tape boundary between the designated area and environmentally sensitive areas, traffic control, construction of temporary access ramps, portable message signs, hydroseeding, and pre-construction and post-construction surveying. randolf.sanders@pw.cccounty.us https://www.contracosta.ca.gov/8658/Walnut-Creek-Desilt

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT