Access the Full Project by Clicking here!
Bidjugde
JOB
2024 Sewer Expansion
BID DATE
03/25/24 - 4:00
AGENCY
Gunnison
ESTIMATE
n/a
SCOPE
The Work is located within the City of Gunnison and extends from the intersection of W. Rio Grande Avenue and S. Wisconsin Street to 210 feet east of the intersection of E. San Juan Avenue and S. Main Street. All work will be in City of Gunnison right-of-way. Work to be performed under this Contract includes, but is not limited to, constructing a 21-inch gravity sewer main with associated connections including, but not limited to, manholes, drop-manholes, piping installed by open-cut methods, and all other Work required in accordance with the Contract Documents. Work includes but is not limited to, removal and replacement of asphalt pavement and concrete gutters, offsite disposal, and traffic control. Work includes replacement of irrigation pipelines that will be crossed during sewer line construction. The condition of existing irrigation lines will be evaluated when excavated during construction of the sewer line. Owner reserves the right to reduce the amount of irrigation piping to be replaced if sections are found to be in good condition. Please refer to RFB documents for details. https://www.bidnetdirect.com/colorado/solicitations/open-bids/City-of-Gunnison-2024-Sewer-Expansion/0000343040?purchasingGroupId=8409951&origin=2 cityclerk@gunnisonco.gov
UPDATES