Access the Full Project by Clicking here!
Bidjugde
JOB
Beeline Lane Waterline Improvements
BID DATE
03/12/24 - 2:15
AGENCY
Harker Heights
ESTIMATE
$755,000
SCOPE
Major Items of WORK: General Conditions Mobilization & Bonds Storm Water Pollution Prevention Plan and Implementation Traffic Safety Implementation Right-of-Way Preparation Revegetation of Disturbed Areas Waterline Improvements Waterline Replacement (8” PVC C900 with Fittings) Steel Encasement by Open Cut (16” diameter, 60 LF) Steel Encasement by Bore (16” diameter, 70 LF) Transfer of Existing Water Services (24 EA) Connection to Existing Lines (2”, 6” and 8”) Pressure and Microbiological Testing of Waterline Roadway and Driveway Repair https://www.civcastusa.com/project/65cf722127e69265a003c590/summary jsimcik@kpaengineers.com
PREBID
2/27/2024 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT