Sereno Drive Pavement Rehabilitation Measure B
BID DATE
03/12/15 - 2:00
AGENCY
Vallejo
ESTIMATE
n/a
SCOPE
The work to be done includes: providing phased traffic control for street closures, potholing for utility verification, over-excavation, placement of geotextile fabric, spreading and compacting of stabilization rock, phased cold-milling removal of asphalt concrete and hotmix asphalt paving, lowering and raising existing utility frames and covers, installing traffic loop detector handholes and conduit, loop detectors or radio presence detectors, installing temporary pavement markers and permanent pavement striping and markings. The bidder shall include in his bid and provide all labor, tools and materials for a complete and working project in conformance with the intent shown on the drawings and specified herein.