Access the Full Project by Clicking here!
Bidjugde
JOB
North Park Improvements 2 La Jolla Improvements 1
BID DATE
04/8/24 - 2:00
AGENCY
San Diego
ESTIMATE
$16,000,000
SCOPE
North Park Improvements 2 The Construction consists of the replacement of 8-Inch water mains, the installation of fire hydrants, water services, trench shoring, traffic control, pavement resurfacing, curb ramps, and all other work and appurtenances, and striping, signage, and electrical improvements. La Jolla Improvements 1 The project proposes construction of approximately 8,660 LF (1.64 miles) of new polyvinyl chloride (PVC) water mains to replace existing 1.5, 4, 6, 8, 12, and16-Inch diameter asbestos cement (AC) water mains including all associated water services, fire hydrants, valves, water meters, and other appurtenances. The project also proposes to abandon 7,194 LF (1.36 miles) of existing 8, 12, and 16-Inch AC water mains. The project also proposes to install bicycle lanes, curb ramps, traffic control, trench restoration, and pavement resurfacing. Juan E. Espindola 619-533-4491 jeespindola@sandiego.gov https://pbsystem.planetbids.com/portal/17950/bo/bo-detail/114563#
UPDATES