11th Street East Tracy Overhead Bridge Replacement
BID DATE
03/3/15 - 2:00
AGENCY
Tracy
ESTIMATE
n/a
SCOPE
Replacement of the existing 11th Street OH Bridge with a shorter bridge in combination with retaining walls and embankment fill at the approaches. Construction of a temporary on-site detour bridge to allow the existing bridge to be removed and the new bridge to be constructed in one stage on a similar horizontal alignment as the existing structure. Reconstruction and widening of 11th Street and MacArthur Drive, including the installation of curb and gutter, sidewalk, pavement section, sewer main, sewer manholes, storm drain lines and drainage inlets, non-potable water lines, new traffic signal and traffic signal modifications, decorative street lighting system, improvement of open drainage channel, landscaping and irrigation, and signing and striping.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT