Access the Full Project by Clicking here!
Bidjugde
JOB
Multiple Street Improvements Phase Iii
BID DATE
03/1/24 - 10:00
AGENCY
Gulfgate Redevelopment Authority
ESTIMATE
$5,000,000
SCOPE
The Multiple Street Improvements project generally involves the following improvements along Airport Blvd from Mykawa Rd to Telephone Road: Construction of 11-inches thick reinforced concrete pavement. Limited construction of 7-inch thick HES reinforced concrete driveways. Limited installation of concrete sidewalks and wheelchair ramps. Installation of 12 & 16-inch water line and fire hydrants and related appurtenances. Removal and replacement of stage II storm sewer inlet. Limited replacement of type B inlet with Type BB inlets. Removal, replacement and adjustments of manholes frame and covers. Installation of proposed thermoplastic pavement markings and signage. https://www.civcastusa.com/project/65c574bc63e50ea37e4f832e/summary mhwoodward@lan-inc.com
PREBID
2/21/2024 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT