JOB
Mary Rhodes Pipeline Ph 1 System Improvements (REBID)
BID DATE
07/24/24 - 2:00
AGENCY
Corpus Christi
ESTIMATE
$9,367,000
SCOPE
Ieconi Engineering & Construction - $10,967,333 Taknek - $12,598,577 CSA Construction General Contractors - $12,738,000 Associated Construction Partners Ltd - $14,936,500 Furnish, install, test, and provide assistance during commissioning for improvements at the Bloomington and Woodsboro raw water booster pump stations that serve the City of Corpus Christi’s Mary Rhodes Pipeline. The work includes the following: Bloomington Booster Pump Station: • A new horizontal split-case centrifugal pump and associated pipe, valves, and fittings. • Two new medium voltage variable frequency drives (VFD), one for the new pump and one to replace an existing VFD on an existing pump. • Remove hydro-pneumatic valve actuators on the pump discharge flow control valves and replace with new electric motor valve actuators for four existing pump trains and one new pump train. • A new electro-magnetic flow meter within a new concrete vault, associated connections to the existing pipeline, and electrical and signal cabling and conduits. • New sump pumps: three in existing valve vaults and one in the new meter vault, and associated controllers, electrical and signal cabling, and conduits. • Sump pump discharge piping from the vaults to the existing water storage tank. • One new low voltage emergency generator and associated duct bank. • Two new outdoor air conditioning units, modifications to two existing air handler units, and associated modifications to ducting, louvers, wiring, and controls. • Replacement of heaved concrete panels adjacent to the storage tank. • Selective process mechanical, building mechanical, and electrical demolition. • Instrumentation and controls programming associated with the new pumps, pump control valves, and flow meters. Woodsboro Booster Pump Station: • One new medium voltage variable frequency drive (VFD) to replace an existing VFD on an existing pump. • Remove hydro-pneumatic valve actuators on the pump discharge flow control valves and replace with new electric motor valve actuators for four existing pump trains. • A new electro-magnetic flow meter within a new concrete vault, associated connections to the existing pipeline, and electrical and signal cabling and conduits. • New sump pumps: three in existing valve vaults and one in the new meter vault, and associated controllers, electrical and signal cabling, and conduits. • Sump pump discharge piping from the vaults to the existing water storage tank. • One new low voltage emergency generator and associated duct bank. • Two new outdoor air conditioning units, modifications to two existing air handler units, and associated modifications to ducting, louvers, wiring, and controls. • Selective process mechanical, building mechanical, and electrical demolition. • Instrumentation and controls programming associated with the new pumps, pump control valves, and flow meters. https://www.civcastusa.com/project/665f238b95613000410f0747/summary clarissaj@cctexas.com
UPDATES