Access the Full Project by Clicking here!
Bidjugde
JOB
2023 Pavement Rehabilitation
BID DATE
03/18/24 - 10:00
AGENCY
San Carlos
ESTIMATE
$8,000,000
SCOPE
The scope of work generally includes mobilization, traffic control, water pollution control, dust prevention and control, site cleanup, asphalt concrete grinding/removal, asphalt concrete installation, asphalt concrete base repair, crack sealing, slurry seal surfacing, ADA ramp construction, utility cover lowering & restoring to grade, loop detector replacement, striping removal & replacement, storm drain manhole, inlet and pipe installation, bioretention installation and all other work as shown on the Plans and as called for in the Technical Provisions and as directed by the Engineer. https://www.cityofsancarlos.org/bid_detail_T4_R181.php
UPDATES