2024 Storm Drain Improvements
BID DATE
03/7/24 - 2:00
AGENCY
Cottonwood Heights
ESTIMATE
n/a
SCOPE
Work for the project (Project # 009.23) consists of the following items of work: mobilization, traffic control, and maintenance of traffic; reconstruction of miscellaneous structures to grade; all required earthwork; reconstruction of disturbed curb and gutter, sidewalks, driveway approaches, ADA access ramps; demolition of miscellaneous storm drain infrastructure; installation of storm drain pipe and structures; removal and disposal of existing storm drain infrastructure; removal and disposal of existing pavement; placing, compacting and grading new asphalt surface course; placing new curb, gutter, and sidewalks; abandonment of existing storm drain pipes; and all appurtenant work Benjamin Nelsen bnelsen@ch.utah.gov