Access the Full Project by Clicking here!
Bidjugde
JOB
Salt Lake City Airport SkyWest Hangar Taxilane Reconstruction
BID DATE
03/7/24 - 1:00
AGENCY
Salt Lake
ESTIMATE
n/a
SCOPE
This project is a continuing phase to maintain an airports infrastructure. The existing taxilane is failing and continuous spalling is creating a FOD hazard for all aircraft in the area. The extent of the damage is to the point where repairs by Airport Maintenance are not lasting because of the pavement condition. Reconstructing this taxilane will provide a new safe entrance for aircraft using the SkyWest maintenance facility and reduce FOD potential for aircraft on Taxiway F in the vicinity of the taxilane. The project will consist of a 5” mill of the existing taxilane and an asphalt pavement overlay. Temporary and permanent drainage improvements will be designed for the project site. Also included in the project will be the installation and relocation of the existing sign and replace the existing lights with LED fixtures and new cable. Bob Bailey bob.bailey@slcgov.com
PREBID
2/22/2024 1:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT