Access the Full Project by Clicking here!
Bidjugde
JOB
WWTP Site Paving
BID DATE
03/12/24 - 2:00
AGENCY
Napa Sanitation District
ESTIMATE
$1,470,000
SCOPE
The general scope of work for this project includes approximately 2400 feet of road rehabilitation work within Napa Sanitation District’s wastewater treatment plant (WWTP) site consisting of full-depth recycling in place and placement of a hot-mixed asphalt overlay, and full-depth asphalt pavement structure replacement for the WWTP access road (Access Road). Work generally includes demolition of existing features or improvements, cold planing the existing roadway surface, pavement mat, shoulder backing, concrete flatwork, drainage improvements, pavement delineation, signage, restoration of gate traffic detector loops and temporary traffic control, including flagging within the adjoining railroad right-of-way as required by the railroad agencies. rcastillo@napasan.com https://www.napasanplanroom.com/jobs/1471/details/wwtp-site-paving-project-cip-22718
PREBID
2/27/2024 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT