Santa Ana River Trunk Sewer Replacement
BID DATE
04/7/15 - 10:00
AGENCY
Riverside
ESTIMATE
$17,893,255
SCOPE
This project entails the installation of approximately 10,500 feet of new 48-inch Centrifugally Cast Fiberglass Reinforced Plastic Mortar (CCFRPM) Pipe using several construction methods. The 48-inch diameter CCFRPM pipe will replace two existing sewer pipes running along the Santa Ana River from where Phase 1 ended at the easterly end of Martha McLean-Anza Narrows Park (Park) located at 5759 Jurupa Avenue to the westerly end of Ryan Bonaminio Park located at 5000 Tequesquite Avenue. The existing pipes consist of a 24-inch Vitrified Clay Pipe (VCP) that was installed in the early 1940s and a 33-inch to 39-inch Vitrified Clay Pipe that was installed in the early 1950s. Thuy Nyugen tnnguyen@riversideca.gov