Access the Full Project by Clicking here!
Bidjugde
JOB
2024 Roadway
BID DATE
02/8/24 - 3:00
AGENCY
Orem
ESTIMATE
$3,000,000
SCOPE
The WORK includes the installation of 3 standard sumps, 1 standard box catch basin, 2 pre-treatment catch basin, 45 linear feet of 12” SDR35 PVC storm drain pipe, 125 linear feet of 15” Class III RCP storm drain pipe, 87145 square yards asphalt section 1 ½” Edge Mill and 2” Overlay (1/2” PG 64-34), 25534 square yards asphalt section 2” Profile Mill and 2” Overlay (1/2” PG 64-34), 5514 square yards roadway excavation and reconstruction 5” asphalt (1/2” PG 64-34), adjust 118 existing manhole to finished grade w/ concrete collar, adjust 125 existing water valve to finished grade w/ concrete collar, and other various improvements . https://orem.org/2024-roadway-project/

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT