Access the Full Project by Clicking here!
Bidjugde
JOB
El Dorado Trail Missouri Flat Road Bike Ped Overcrossing Phase 2
BID DATE
03/18/24 - 2:00
AGENCY
El Dorado County
ESTIMATE
$5,000,000
SCOPE
Furnishing and installing a prefabricated steel pedestrian overcrossing structure, including precast prestressed concrete girders, mechanically stabilized earth retaining walls, structural concrete, hot mix asphalt paving, metal handrailing, signing, and striping. Other items or details not mentioned above, that are required by the plans, Standard Plans, Standard Specifications, or these Special Provisions must be performed, constructed or installed.
UPDATES