Access the Full Project by Clicking here!
Bidjugde
JOB
Rialto Airport Demolition - Phase 2
BID DATE
02/26/15 - 3:00
AGENCY
Rialto
ESTIMATE
$1,250,000
SCOPE
The Work comprises of soil remediation and pavement demolition and pavement removal. The soil remediation includes the preparation of the stockpile site, abatement, removal and disposal (“remediation”) of Chemicals of Concern (COCs) to be excavated, segregated and managed by either relocating soils onsite and/or offsite for disposal at an appropriate disposal facility that are located at the City of Rialto Municipal Airport and designated for removal by the City. The pavement demolition and pavement removal includes the pulverization of existing Asphalt Concrete (AC) Pavement or AC Overlay and the demolition and processing/crushing of existing Portland Cement Concrete (PCC) pavement, building foundations, curbs, curbs and gutters, ribbon gutters, and other miscellaneous PCC slabs located at the City of Rialto Municipal Airport and designated for pulverization or removal by the City. The work also includes backfilling soil remediation sites, applying soil binder application to the backfilled sites as well as grading to maintain current drainage patterns within all disturbed areas of the work.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT