Access the Full Project by Clicking here!
Bidjugde
JOB
Via De Anza Street Improvements Phase III
BID DATE
02/12/24 - 2:00
AGENCY
Cathedral City
ESTIMATE
n/a
SCOPE
The scope of work consists of furnishing all supervision and labor, materials, necessary equipment and tools, utility work, traffic control, and public services coordination required for the completion of the Project. The proposed street improvements include pulverization of existing asphalt pavement, shaping, moisturizing, and compacting existing base material and asphalt concrete (AC) overlay, sidewalk gap closures, concrete driveway approaches, ADA compliant sidewalk ramps, and curb and gutter gap closures, removal and construction of garden walls, pavement striping, lowering and raising utilities to final grade from Olancha Road to Ortega Road along the east side of Via De Anza and the Arrowhead Road east Cul-de-sac in the City of Cathedral City. Improvements also include construction of ductile iron water pipeline and abandonment of existing concrete water pipeline. All work and resulting facilities will fully conform to the current adopted Coachella Valley State Implementation Plan (CVSIP) for PM-10 including Best Management Practices during the construction process. https://www.cathedralcity.gov/Home/Components/RFP/RFP/186/1729

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT