City Hall Bridge Police Headquarters
BID DATE
02/29/24 - 2:00
AGENCY
Bulverde
ESTIMATE
n/a
SCOPE
The purpose of the Project is to establish vehicular and pedestrian accessibility across a drainage channel that runs between the City’s Police Headquarters and the existing City Hall. The Project Work consists of construction of 57.3 LF of Reinforced Concrete Roadway with 5' wide Sidewalk and Pedestrian Rail, construction of 3 - 5' x 3' Box Culverts, Concrete Headwalls, Channel Grading, Riprap, Installation of Electrical Conduit and Illumination, and modifications to existing electrical infrastructure. svham@bulverdetx.gov https://www.civcastusa.com/project/65bbdfc16c2904591aaaca46/summary