Access the Full Project by Clicking here!
Bidjugde
JOB
Water Improvements Chino Drive Water Main Replacement Aqua Fria Storage Tank
BID DATE
03/7/24 - 3:00
AGENCY
Valley Pioneers Water Company
ESTIMATE
$3,700,000
SCOPE
Site work for a civil project in Golden Valley, Arizona. Completed plans call for site work for a water / sewer project. The project generally consists of, but is not necessarily limited to, the following major items: Schedule 1 - Installation of approximately 16,000 lineal feet of 12-inch PVC DR 14 distribution piping within the right of way of Chino Drive. The new main will generally be constructed on the opposite side of Chino Drive and parallel to the existing 6-inch main. Main installation will include trench excavation including cross street distribution pipe connections and installation of fittings and appurtenances. All water services shall be connected to the new 12-inch main and cross street water service connections shall be installed using the bore and jack method. Schedule 2 - Construction of a 500,000-gallon welded steel water storage tank adjacent to the existing 500,000 water storage tank located at the Agua Fria tank site. Other items include site preparation; base preparation; connecting to buried pipe, valves, and appurtenances; fence removal and replacement; and concrete splash pad construction. https://www.valleypioneerswater.com/ 928-565-4663 sshea@m-m.net
PREBID
2/22/2024 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT