Access the Full Project by Clicking here!
Bidjugde
JOB
6 Inches Water Line Roadway Improvements
BID DATE
02/2/24 - 2:00
AGENCY
Vernon - TX
ESTIMATE
n/a
SCOPE
Gordon Street Water Improvements a. 1,340 LF of 6” C-900 DR-18 PVC Water Line b. 12x 6” Gate Valves with Boxes c. 3x 2”x2” Tapping Sleeves d. 5x 6”x6” Tapping Sleeves e. 5x 1” Water Service Connection f. 1.1 ton of Ductile Iron Fittings g. 2x Fire Hydrant Assemblies h. Cut and cap at six (6) locations on existing water lines i. Connection of the proposed water line to the existing water lines Gordon Street Roadway Improvements a. 7,159 SY of Two-Course Surface Treatment b. 53 SY of Base Add/Repair and Two-Course Surface Treatment c. Removal and replacement of 736 LF of Curb and Gutter https://www.civcastusa.com/project/65a846daea44d2aaded9d423/summary marcus.michalewicz@kimley-horn.com
UPDATES